The total area of the land is 9,000 sq.m. located on a main provincial
road.
The spring can continuously supply 300 cubic meters of water per hour.
This spring can become a profitable suggestion for investors either for
the production of bottled water or for the distribution of water with a
water tank or for water distribution through the local water supply
network.
From the chemical analysis of the water but also from the geological
study it is concluded that there is no danger of depletion of the water
resources neither are they affected from the nearby drillings.